| Date |
Subject |
Trainer |
|
| Feb 15-18 |
| Feb 19 |
| Mar 17-19 |
| |
| Apr 6-9 |
| Apr 15-16 |
| May 25-28 |
| June 23-25 |
| |
| Jul 15-17 |
| Aug 24-27 |
| Sep 13-15 |
| Sep 16-17 |
| |
| Oct 13-15 |
| Oct 27-29 |
| Nov 10-12 |
|
| Vibration
Analysis I |
| Introduction to Alignment |
| Ingenieria de Confiabilidad
Aplicado a la Gestion de Mant. |
| |
| Infrared I |
| Maintenance & Reliability
Optimization Work Shop |
| Vibration Analysis II |
| Ultrasound
I |
| |
| RCM |
| Vibration Analysis I |
| Expert Alert |
| Introduction to Alignment |
| |
| Lubricación, Fluídos y
Control de Fricción |
| Asset Output Optimization
(TPM) |
| Infrared I |
|
| C.
Rodriguez |
| J Sifonte |
| J Sifonte |
| |
| A. Reyna |
| J. Stanek Jr. |
| J. Sifonte |
| G. Velazquez |
| |
| J. Sifonte |
| J Sifonte |
| C. Rodriguez |
| J Sifonte |
| |
| E. Gutierrez |
| J. Sifonte |
| A. Reyna |
|
|
|
Training Schedule for 2010 (International) |
|
|
|
|
|
|
México |
|
|
|
|
| Ingenieria
de Confiabilidad Aplicado a la Gestion de Mant. |
| RCM |
|
|
|
|
|
| Ingenieria
de Confiabilidad Aplicado a la Gestion de Mant. |
| RCM |
|
|
|
|
|
|
|
|
Perú |
|
|
| May 19-21 |
| Aug 11-13 |
| Oct 20-22 |
| Dec 2-3 |
|
| Reliability Centered
Maintenance |
| Ingenieria de Confiabilidad
Aplicado a la Gestion de Mant. |
| Asset Output Optimization TPM |
| PMO |
|
| J. Sifonte |
| J. Sifonte |
| J. Sifonte |
| J. Sifonte |
|
|
|
|
|
|
|
Ecuador |
|
|
| April 6-9 |
Vibration Analysis II |
J. Sifonte |
|
| April 20-23 |
Vibration Analysis I |
J. Sifonte |
|
|
|
|
|